A memoir, self-help and how-to book

My book, Zen (and Rage) and the Art of a Never-Ending Home Renovation, is a humorous and sometimes harrowing account of surviving and even thriving during a decade long home renovation project co-produced with my husband. This is the story of the monumental project we undertook to morph our adorable little colonial reproduction home into an energy-efficient, sustainability-minded house over twice the size in just over three times the original timeframe––with almost no lasting loss of sanity!

about the book

​"Marcia's vivid, deeply self-aware, portrait of marriage and resiliency, Zen and Rage, family and friendship, is by turns poignant and funny––and sometimes both at once. It's down-to-earth and relatable, even if you don't have a spouse with the talents of her husband.

Part memoir, part how-to, and part self-help, with consistent doses of humor, this guide will teach you much about the trials, tribulations, and triumphs of energy-efficient home renovation, and even a few pointers for fostering your own Zen when your world is full of chaos.”

buy the book

read reviews

project photos

ready to read?

now available at major book stores:

what people are saying

project photos

A collection of albums from different phases of the renovation. For more information about Passive House Standards, visit www.phius.org

1  Early Days: Garage Mahal

Taken circa 2007-2008, here are just a few shots of the very first part of this project, the demolition of our old, two-car garage, and its shiny new replacement, which I affectionately dubbed, "The Garage Mahal."

2  Demolition

Our "demo" happened in two parts. First came what was needed in order to pour the foundation and slab for the addition. That was in 2010. Part two followed in May of 2011 when we dismantled the entire second story of our original house in order to make way for the new structure. That left us living solely in the first floor and basement area of the original house, a space which I came to call "the shoebox." There we remained until the work was far enough along, several years later, that we could break through the exterior walls of the original house and begin to integrate the spaces.

3 Foundation

A brief, but intense (and very rainy, and muddy) period in our journey, March and April, 2010.

4 Framing and Roofing

This work, which established the baseline structure for the house, ate up the rest of 2011, as we battled excessive rain (without a roof), an October snowstorm, and oh-so-many more natural and self-inflicted challenges.

5 Siding & Exterior

This "phase" of the project began in late 2012 and ran longer than any other. Given some of the other projects I have in mind for the future, it still isn't over!

6 Insulation

Another two-phase project, though this action happened over just (?!) four months, from September 2015 through January 2016.

7 Interior

If you're interested in what it takes to get from studs to a fully finished home, this is the place to satisfy your curiosity! These efforts began in late 2015 and ran through half of 2019.

8 Landscaping

This will definitely be the "canvas" for more work – meanwhile, here's how the journey so far, which began in September 2019, has unfolded.